THE PROJECT


The project included asbestos abatement and demolition of the former DTE Marysville Power Station and thirteen outbuildings. AKT Peerless provided oversight and air monitoring during the abatement of asbestos containing materials (ACM) based on an initial asbestos survey performed by others. Additionally, suspect materials not previously identified during the initial survey were sampled by AKT personnel to confirm asbestos content. 

Former Marysville Power Station, Marysville, MI - Health Care Systems, Schools & University Environmental Consulting Service - Screen_Shot_2020-07-15_at_2

OUR ROLE


AKT Peerless conducted limited air monitoring and project oversight during abatement of regulated asbestos containing pipe insulation, boiler insulation, duct insulation, conduit wrap, boiler/duct gaskets and caulks at the project site. During abatement, AKT Peerless reviewed setup of regulated work areas, negative pressure enclosure integrity, abatement methodologies and effectiveness of final cleanup. Upon completion of abatement and in advance of air clearance, AKT Peerless conducted a visual inspection of regulated work areas to confirm effective removal of ACM. 

AKT Peerless performed air monitoring associated with the project to comply with regulatory requirements. Sampling pumps were pre- and post-calibrated using a secondary rotameter calibrated to a primary standard. Outside work area sampling was conducted during friable abatement to ensure airborne fiber levels were below regulatory limits. Personnel sampling was performed during abatement to ensure compliance with MIOSHA requirements. Post abatement air monitoring was performed after the work was completed to confirm compliance with the Michigan clearance standard. 

Air sampling results indicate airborne fiber levels during and after asbestos abatement remained within regulatory limits. Final clearance levels were below the Michigan required clearance level of 0.05 fibers per cubic centimeter (f/cc) of air in all clearance locations. 

Former Marysville Power Station, Marysville, MI - Health Care Systems, Schools & University Environmental Consulting Service - Screen_Shot_2020-07-15_at_2

THE RESULTS


AKT Peerless reviewed abatement work practices for compliance with OSHA and EPA requirements and completed asbestos abatement monitoring.  Air sampling results indicated airborne fiber levels during and after asbestos abatement remained within regulatory limits.  Further, AKT Peerless conducted a post abatement visual clearance inspection to confirm the removal of abated ACM and determined that abatement and subsequent cleanup and disposal met regulatory criteria. In addition to meeting environmental compliance requirements, the successful ACM abatement prepared the structures for maximum recyclability of building materials. 

Let Us Bring Due Diligence to Your Project

See All Projects
  • Preparing to develop one of Michigan’s largest Brownfield projects was a daunting task and would not have been possible without the guidance and support of AKT Peerless. Dean Kiriluk, Executive Vice President Kirco
  • Thank you for your hard work and effort. You and your team went far and beyond the call of duty. Andy Gutman, President of The Farbman Group
  • AKT Peerless have been a thoughtful, innovative and valuable partner. Their proposals are carefully thought out, well written and reasonably priced. Anna M. Mauiri, Attorney Dickson Wright
Request a Quote
AKT offers environmental, energy, economic development and construction services that are tailored to the needs of each of our clients, private and public sector alike.
* Indicates required questions
Name *
First
Last
Company Name *
Your Role *
Phone # *
Email *
Assessment is needed by the following date
Property Address *
Property City *
Property State *
Comments: