Filling Station Redevelopment, Hampshire, IL

Environmental Remediation and underground storage tank services for fueling station in Illinois.

THE PROJECT

AKT Peerless provided environmental consulting services to a business partnership consisting of a real estate investment firm and a regional convenience store chain to facilitate the acquisition and redevelopment of a 50-year-old truck stop property into a new filling station and convenience store.   

The property was originally developed as a truck stop in the late 1960s and had utilized multiple USTs during its operations.  Four separate Leaking UST (LUST) incidents were previously reported at the subject property.  All of the LUST incidents were previously addressed and received risk-based regulatory closure from the Illinois Environmental Protection Agency’s (EPA) LUST Program, which allowed certain subsurface contaminants to remain in place with the implementation of institutional controls designed to prevent future human exposure.

OUR ROLE

AKT Peerless was originally contracted to provide environmental due diligence services prior to the acquisition of the subject property.  During the Phase I Environmental Site Assessment (ESA), AKT Peerless recommended an investigation be performed to determine current subsurface environmental conditions.  Multiple soil and groundwater samples were collected from the subject property and submitted to an environmental laboratory for analysis.  The laboratory results indicated contaminants were present at concentrations exceeding those permitted to remain in place by the Illinois EPA, which potentially indicated evidence of a new release from the in-place UST systems.  

Following the acquisition of the subject property, AKT Peerless contacted the Illinois Emergency Management Agency (IEMA) to report a new petroleum release from the existing UST systems and later coordinated and oversaw their removal, during which time evidence of a new release was confirmed.

AKT Peerless later prepared a hazardous building material survey prior to demolition of the existing subject buildings; developed a construction soil management plan; and provided soil management oversight and coordination during redevelopment.

THE RESULTS

AKT Peerless’ wide-range of environmental and construction-related services allows our clients to make informed and economical business decisions during the acquisition and development phases of environmentally impacted properties.

Specifically, AKT Peerless:

  • Coordinated and oversaw the remove and proper disposal of approximately 1,100 cubic yards of impacted soil and 6,500 gallons of impacted, perched groundwater;
  • Performed subsurface soil and groundwater investigations to characterize the nature, extent and migration potential of subsurface contamination;
  • Completed LUST Program reporting requirements that demonstrated subsurface contamination remaining at the subject property could be managed in-place under the existing institutional controls, which resulted in regulatory closure of the LUST incident; and
  • Completed LUST program Reimbursement Applications, which recouped approximately 80% of fees utilized to address the former USTs

Our Other Projects

Sediment Sampling & Environmental Drilling, Port of Monroe, MI

Former Dry Cleaner Operation, Detroit, MI

LUST Remediation, Coopersville, MI

LUST Remediation, Commercial/Residential Area, MI

Water Street Redevelopment, Ypsilanti, MI

Flint River Redevelopment, Flint, MI

Legacy Rochester Hills Apartments, Rochester Hills, MI

Municipal Landfill, Mount Clemens, MI

Hotel Adaptive Reuse Redevelopment, Southfield, MI

Southgate Tower Redevelopment, Southgate, MI

Northland City Center Redevelopment, Southfield, MI

Detroit Food Commons, Detroit, MI

Dorsey Estates, Ypsilanti, MI

DTSC Enforcement Case-Former Dry Cleaners, Richmond, California

Leaking UST, Kent City, MI

Vapor Intrusion Assessment and Mitigation, Grand Rapids, MI

Former Middle Grounds Landfill, Bay City, MI

Fire Station, Bay City, MI

HUD Environmental Assessments, Akron, OH

Surrey Square Shopping Mall, Norwood, OH

Due Diligence and Risk Reduction Program for National Home Builder Real Estate

Preacquisition Due Diligence, Cincinnati, OH

Construction Loan Monitoring for Queen City Textile Building, Cincinnati, OH

Construction Loan Monitoring for MAGNET Headquarters, Cleveland, OH

Archdiocese of Detroit (AoD) AHERA School Management

Gasoline Station and Convenience Store, Toulon, IL

Salt Shed, Chicago, IL

AKT Peerless New Development Downers Grove IL

New Development, Downers Grove, IL

Vacant Lot turned New Development, Mount Prospect, IL

Riverfront Campus Redevelopment, Saginaw, MI

Water Street Mixed-Use Redevelopment, Bay City, MI

U.S. Post Office ACM Abatement Management, Bellevue, MI

Saginaw Public Schools, Saginaw, MI

The Albion at Oak Park, Oak Park, IL​

Navy Pier, Chicago, IL

Hotel Clermont, Atlanta, GA

Founder’s Landing, Marquette, MI

Fordson Island, Dearborn, MI

Guardian Industries

Guardian Industries, Michigan Locations

Energy Utility, Jackson, MI

Powerhouse and Paper Mill, Monroe, MI

Distribution Warehouse, Indianapolis, IN

Springs at Greenville, Greenville, SC

Compliance Solution for EECBG Program, Cook County, IL

Commercial Area, Ionia, MI

Henry Ford Cancer Care Center, Detroit, MI

Hotel St. Regis, Detroit, MI

Former La-Z-Boy Manufacturing Facility, Monroe, MI